top of page


Case Study: Sports Pavilion Rewire at The King’s School, Peterborough
Optimum Electrics completed a £38,000 electrical refurbishment and full rewire of The King’s School sports pavilion in Peterborough, including lighting, emergency lighting, ventilation and power.h
Aug 263 min read


Case Study: 10.12kW Solar PV, Battery Storage & Electrical Upgrade Installation – March, Cambridgeshire
Discover how Optimum Electrics transformed this home with a 10.12kW AIKO solar PV system, 16kWh SigEnergy battery storage, consumer unit upgrade and EICR, delivering lower energy bills, improved safety and a future-ready electrical installation.
Aug 33 min read
Optimum Electrics Blog
bottom of page
